10 ton horizontal steam boiler image

10 ton horizontal steam boiler

FOB price:9999-99999   Get latest price

Min.Order Quantity: 1 set 10 ton horizontal steam boiler

Supply Ability: 10 set/Month 10 ton horizontal steam boiler

Manufacturer/Brand:ZG boiler

Port:Shanghai

Payment Terms:L/C,T/T

Inquiry button image

10 ton horizontal steam boiler Details

  • Condition: New
  • Model: WNS,SZS,SZL,DZL
  • Pressure: Low and medium Pressure
  • Drum Placement: Horizontal boiler
  • Place of Origin: China
  • Manufacturing Level: A class
  • Usage: Industrial
  • Output: steam
  • Thermal efficiency: 90%
  • Installation: Packaged boiler
  • Burner: Baltur/Riello/Weishaupt
  • Standard: ASME, ISO,IBR
  • Weight: according to models
  • HS code: 84021900
  • Type: fire tube ,water tube,water and fire tube

Fuel:biomass-fired,coal-fired,natural gas fired,LPG fired,Light oil fired,Heavy oil fired,rice husk fired,wood fired,Bagasse fired

Application: Chemical plant,Food factory,Beverage factory,cannery,Garment factory,Textile mills...

Capacity: 1 ton,2 ton,3 ton,4 ton,5 ton,6 ton,7 ton,8 ton,9 ton,10 ton,15 ton,20 ton,25 ton,30 ton,35 ton...

10 ton horizontal steam boiler Packaging & Delivery

Packaging Detail:Regular packing or nude packing, or upon customers requirement. Transportation: by land or by sea, depended on the exporting area

Delivery Detail:about 45 days after payments

Product introduction

10 ton horizontal steam boiler

10 ton horizontal steam boiler have many types in ZG boiler company, according to the type of steam boiler, the boiler shipping is different, such as Overall manufactured,Assembly. All ZG 10 ton industrial steam boilers is PLC control, Compact structure, small installation space, single-floor boiler room, cost-effective infrastructure.u5gHorizontal boiler

In October 2014, Vietnam customer purchase 10 ton steam boiler, - See more at: http://www.zbghorizontalboiler.com/10ton-steam-boiler-in-Vietnam.htmlu5gHorizontal boiler

10 ton Steam boiler technical specification

10ton steam boiler in workingu5gHorizontal boiler

10 ton biomass fired steam boiler working in Sinian Food plantu5gHorizontal boiler

WNS10-1.0(1.25)-Y(Q) , SZS10-1.25-Y(Q), DZL10-1.6,DZL10-1.25, SZL10-1.25, SZL10-1.6,SZL10-2.5 SHL10-1.25, SHL10-1.6, SHL10-2.5u5gHorizontal boiler

In the 10 ton boiler model list, 10 ton horizontal steam boiler can choose fuel: natural gas, light oil, heavy oil, biomass fuel, rice husk, coal, etc.u5gHorizontal boiler

How to install a 10 ton industrial steam boiler

Steam Boiler installation and construction units must hold a boiler installation license issued by local labor department which consistent the boiler level installation type, and have some experience in boiler installation and good installation quality.u5gHorizontal boiler

10 ton steam boiler Preparation before installationu5gHorizontal boiler

Whether preparation before installation is adequacy or not, will directly affect the progress of construction, quality and efficiency. Preparation before installation can be divided into:u5gHorizontal boiler
a. technical preparation: learning full boiler drawings and technical information. Based on existing national regulations, standards, technical standards and construction contracts, make the construction program, plans, technical rules and technical measures.u5gHorizontal boiler
b. material preparation: equipment, materials, construction machinery, processing equipment and processing piece standards.u5gHorizontal boiler
c. personnel preparation: with various types of personnel, technical training and technical tests.u5gHorizontal boiler
d. construction site preparation: proof of construction site and traffic roads, environmental clean-up, divided the construction site, layout according to the construction design, temporary erection for construction use.u5gHorizontal boiler
e. power preparation: water, electricity, compressed air (if necessary), and other pipes and lines laying.u5gHorizontal boiler
When installation should consider the distance between boiler and buildings, to ensure that it’s sufficient to meet operational needs, maintenance and support facilities layout, in line with the relevant provisions .u5gHorizontal boiler

10 ton steam boiler body installation:u5gHorizontal boiler

a. After boiler foundation achieve the strength and acceptance requirements, draw three boiler baselines:u5gHorizontal boiler
Vertical reference line ---- Drum Centeru5gHorizontal boiler
Transverse baseline ---- position line on the front panel or the panel position lineu5gHorizontal boiler
Elevation Baseline ---- choose a number of points around the basis to make mark, the corresponding offset between two marks should not exceed 1mm.u5gHorizontal boiler
b. It’s better to use hanging method to place boiler if allowed on site, handling generally use "rolling method", if the boiler foundation above the ground, should use templates, woods to put up a slope (must be able to withstand the weight of the boiler) and tract boiler to the foundation.u5gHorizontal boiler
c. After the boiler body be placed on the foundation, should check the center line first, whether match with the line drawing on the base; the normal water level of the water level gauge is level or not; then check the contact of base and foundation is tight or not, if there is a gap, should add horn and correct until it’s level, the boiler body must be put balanced, solid, level, can not be ignored.u5gHorizontal boiler
d. Special Note: The boiler body has been equipped with thermal insulation packing and trunking delivery from our company, so pay special attention not to touch the walls and other items, to avoid damage exterior insulation of the boiler when installing.u5gHorizontal boiler

Success Cases

3 ton Gas boiler in Indonesia

WNS3-1.0-Y horizontal gas fired boiler for sale is fire tube boiler, with capacity 3 ton, the boiler is used for food processing plant for sterilization. now the boiler has installed in Indonesia.

Customer's Background:

In 2014, the customer contacts with the online service, stating that they need to gas boiler for food processing. Their requirements are as follows:
Fuel: Natural gas
Pressure: 1.0Mpa
Capacity: 3-4Ton
Special requirements: one month delivery

Packaging & Shipping

Packaging and shipping

Company Information

Zhengzhou Boiler CO.; Ltd is a leading industrial horizontal boiler manufacturer and exporter in Henan Province, China, founded in 1945, is a joint-stock enterprise with A1, A2, C3 pressure vessel design and manufacture license permits. We are specialized in the producing of Oil Gas fired boiler,Biomass fired boiler,Coal fired boiler,Chain grate boiler,CFB boiler,Waste heat recovery boiler,Industrial autoclave,AAC block plant. The industrial boiler and autoclaves are developed with technical advantages, stable and reliable performance, exported to over 100 countries.

Basic Information

Established:In 1945

Number of Employees:above 1500 People

Our products:industrial horizontal steam boiler and hot water boiler(biomass boiler, gas boiler, oil boiler, coal boiler, etc), CFB boiler, power plant boiler, Pressure Vessel(AAC autoclave, Curing tank,etc )

Factory Size (Sq.meters):400,000 square meters

Factory Location:Factory 1: Zhengzhou,,Henan, China. Factory 2: Xingyang,Henan,China

Number of R&D Staff:376 people

ZG boiler company

Our Trade & Market

Export Percentage:30-40%

Total Annual Sales Volume:US$100 Million

Main Market:South America(Colombia, Venezuela, Guyana, Suriname, Ecuador, Peru, Brazil, Bolivia, Chile, Paraguay, Uruguay, Argentina and French Guiana),
North America(Bahamas, Canada, Costa Rica, Cuba, El Salvador, Guatemala, Honduras, Haiti, Jamaica, Mexico, Nicaragua, Panama),
Eastern Asia(Mongolia / Russia / North Korea / South Korea / Japan),
Oceania(Australia, New Zealand, Fiji),
Mid East(Bahrain, Egypt, Iran, Iraq, Israel, Jordan, Kuwait, Lebanon, Oman, Qatar, Saudi Arabia, Syria, UAE and Yemen, Palestine, Algeria, Libya, Morocco, Tunisia and Sudan, Mauritania and Somalia),
Africa(Egypt, Sudan, Libya, Tunisia, Algeria, Morocco, Ethiopia, Somalia, Kenya, Tanzania, Uganda, Rwanda, Guinea, Sierra Leone, Liberia, Cote d'Ivoire, Ghana, Togo, Benin, Niger, Nigeria, Cameroon, Gabon, Congo (Brazzaville), Zambia, Zimbabwe, Angola, Mozambique, Botswana, Namibia, South Africa),
South Asia(Nepal, Bhutan, India, Pakistan, Bangladesh, Sri Lanka, Maldives)
Southeast Asia(Vietnam, Laos, Cambodia, Thailand, Myanmar, Malaysia, Singapore, Indonesia, Brunei, the Philippines, East Timor)
Domestic Market(China)

Our service

10 ton horizontal steam boiler packing

1.Any products quality problems manufactured and sold by our company ,our company will execute "Three Contract "service, our sales service three contract team will be in charge of this job.
2.The minute we received products quality information from our customers(by means of call, mail or oral notice),we will dispatch related staff to settle the problem on site at once.
3.After sale service staff must settle related quality problem carefully, considerately, guarantee clients timely use without further worry.
4.At the same time of timely settlement of sold products quality problem, after sale service staff is committed to provide technical consultation, training for clients without extra expense as well as answer other products related problems.
5.All confirmed company products quality problem case; all expenses would belong to our company. For the products quality problem caused by customers(or over quality guarantee period products quality problem)our company will charge accordingly, but not higher than overall expenditure expenses.(or cost fee)
6.Firmly establish the idea the customer is our lord. consider customer's need by all means, handle related quality problem timely and carefully, take honesty and creditability as the first policy to finally reach the full satisfaction of our customer.
7.Establish after sale service hot line: +86-371-86678488

FAQ

1: Why choose ZG boiler Products?

A: We have a professional installation and after-sales staff,
We have the largest factories and production capacity, and over 70 years industrial boiler experience
We have a professional sales and service team.

2: How much the price of 10 ton horizontal steam boiler?

A: We need know the details of 10 ton horizontal steam boiler, for example cpacity, pressure, etc, water tube boiler cost, please contact online service by click here

3: how long is the product warranty period ?

A: warranty period is 12 months

4: Where can we buy the boiler's parts?

A: Our company can provide parts for your any time, please provide your boiler model.

5: if the boiler works wrong, how your company resolved in foreign ?

We have professional engineers, after receiving your request, we will solve your problems at first time.

Certificate
Inquiry

Your email address and telephone will not be shared or published!

Please fill in your need products and your message and do not forget mail and/or phone if you like to be contacted. we are the professional machine manufacturer in China.

We need to ask you some details for sending you the more suitable quotation,

1.what is the application of the boiler?
2.what is the capacity per hour do you need?
3.which fuel do you want to use for your boiler, coal, biomass, gas & oil, or others?
4.what is the pressure of your boiler?

Send your inquiry to us

The form below with * are required, please fill in your detailed requirements, example: Evaporation capacity, Outlet steam pressure, Outlet steam temperature, etc..
Produts You May Like
Related keywords

Related News about horizontal boiler

Product classification

News & Cases

How to contact us

Email:[email protected]

Tel:+86-371-86678488

Site:wwww.zbghorizontalboiler.com

Skype:zgboiler1945